Power Infrastructure Development

Your data center deal is waiting 3-5 years for power.
We deliver it in 18 months.

3–5
yr
Their interconnection queue
18
mo
Our timeline. Simple cycle. Turbines available now.
37,000+
MW
Execution partner MW executed
Start a Conversation

Approach

The grid can't keep up.
We don't wait.

The Bypass

The grid says 3-5 years. We build behind-the-meter power in ERCOT that eliminates the queue. Simple cycle. 18 months to power. No interconnection application. No utility timeline.

Turbine procurement is the second bottleneck — lead times exceed 2-3 years and most developers can't solve it. Our execution partner has procurement access across every major platform, built over 77 years of continuous delivery. We secure equipment now.

How We Deliver
01
Origination
Power needs assessment, site screening, load modeling, Go/No-Go decision.
02
Engineering
FEL 1-5, interconnection strategy, permitting, Basis of Design.
03
Capital
Financial structuring, PPA/tolling design, project finance packaging.
04
Execution
Equipment procurement, EPC oversight, commissioning to COD, O&M transition.
What We Build

Four plant configurations. Each sized and optimized for the load profile, site constraints, and capital structure of the project.

15–300 MW
Simple Cycle Gas Turbine
Fast-deploy & peaking
18 month delivery
40–1,250 MW
Combined Cycle Gas Turbine
Baseload data center campuses
50–300 MW
Battery Energy Storage
Grid support & load balancing
15–150 MW
CHP / Cogeneration
Campus heat + power

Every data center project stuck on power is a deal that can't close, can't get funded, and can't break ground.
We solve that.

37,000+
MW Executed
A+
ISN Safety
ISO 9001
Certified
6
Continents
All Major
OEM Platforms

Execution Backbone

Thole develops the project.
Curtis Stout Power builds it.

1947

Curtis Stout Power (CSP) is the power generation division of Curtis H. Stout Inc. — an institution in the electrical industry since 1947. CSP emerged through the strategic alliance of the Curtis Stout brand with TG&H Industrial Energy Services in 2024, bringing together nearly 80 years of institutional heritage with a globally-tested power generation team. Their portfolio includes the landmark commissioning of the first 7HA.02 2x1 Combined Cycle Power Plant in the United States.

Ron Smith
President & CEO, Curtis H. Stout Inc.
Nearly 80 years of institutional heritage in electrical infrastructure, utility services, and energy solutions. 9 divisions. $200M+ annual operations. The enterprise behind the Power division.
Chris Tumey
President, Curtis Stout Power
Founded TG&H Industrial Energy (2017), transitioned to CSP (2024). Global project portfolio spanning all plant configurations and major turbine manufacturers. First US 7HA.02 2x1 commissioning.
Ronnie Bunch
VP Project Management
Nearly two decades in power generation. 13+ GW added to the electricity grid. Planning, design, construction, and commissioning of state-of-the-art power plants.
Douglas Mitchell
VP Global Business Development
Combined cycle, simple cycle, BESS, distributed generation, microgrids. International project experience including Eastern Europe and North Africa.
Project Development
Project Management & Construction
Startup & Commissioning
Field Services
Operations & Maintenance
Project Controls
Consulting
Electrical Testing
Combined Cycle
Simple Cycle
Solar
Waste-to-Energy
CHP / Cogeneration
Battery Storage

Execution depth: Hydrolazing, steam blowing, chemical cleaning, air blowing, oil flushing, hydrotesting, DCS commissioning — full lifecycle field capability from NTP through commercial operations.

Capability

Who does what.

Clear lanes. No finger-pointing.

Thole Development
  • Deal origination & site screening
  • Power needs assessment & load modeling
  • Feasibility analysis & Go/No-Go
  • Financial structuring & project finance
  • PPA & tolling agreement design
  • Owner's representation
  • Long-term asset management
8
Curtis Stout Power
  • FEL 1-5 engineering management
  • Equipment procurement & allocation
  • EPC & construction management
  • Startup & commissioning
  • Field services & industrial cleaning
  • Operations & maintenance
  • Project controls & scheduling
Adam Rutz
Founder & Principal

Former Navy SEAL. Energy infrastructure operator. Currently managing 1,600+ energy assets for institutional real estate. Thole was built to develop the power infrastructure that makes critical facilities possible.

Background
U.S. Navy SEAL — BUD/S 298
Operations
1,600+ assets under management
Client Base
Institutional real estate
Headquarters
Dallas, Texas

About

The unseen piece that makes the deal move.

"Thole" is Old English — to endure without complaint. A thole pin is the fitting that holds the oar in place. Without it, the boat doesn't move. Both meanings define how we operate.

Speed
3-5 years in queue, or 18 months with BTM generation. We can start tomorrow.
Procurement
Turbine lead times exceed 2-3 years. We secure equipment now. This window won't stay open.
Bankability
37,000+ MW executed. Lenders underwrite track records, not promises.
Single Point
One team. Full lifecycle. No finger-pointing between developer and EPC.
ERCOT Depth
Deep expertise in Texas's deregulated market. Behind-the-meter and front-of-meter.
North America
South America
Europe
Africa
Asia
Middle East
Australia

Contact

Let's talk.

Adam Rutz
Founder & Principal
[email protected]